14 Optimization and design
1° change in overall slope reshape the pit
This visual compares 40° vs 41°, with all other inputs held constant. This not a recommendation but It's simply a demonstration of how sensitive pit geometry is to small changes in slope angle. Geotechnical and safety considerations remain essential. (Non realistic datas)