14 Optimization and design
A mathematical model for optimising cut-off grade and stockpiling policies in open-pit mines with grade engineering
This work extends Lane’s cut-off grade optimization framework by integrating pre-concentration and stockpiling decisions. Applied to a copper deposit, the model improved recovery, reduced waste, extended mine life, and increased NPV, demonstrating both economic and sustainability benefits. Source: https://www.sciencedirect.com/science/article/pii/S0301420725002582